Sunday 9 March 2008

Development work

Post South West Endurance Rally development work :-

- Jet wash Done 15th March '08 and wash car
- Full bolt check, including sump guard which worked loose - Done 29th March '08
- Fluids check - Done 13th March '08
- Add switches and new loom to allow for manual switching for cooling fans
- Re-fit and loctite windscreen wiper motor mounts - Done 29th March '08
- Fit new camera mount and remove current bullet cam set-up - Done 29th March '08
- New name stickers.....
- Alter drivers seat position (up and forwards) before the upcoming Gymkhana - Interim testing with foam will be used on the Gymkhana - 29th March '08
- Fit 1.8 VVCi exhaust system and new back box or remove bend from current back box after a 'moment' in woods ;)
- Re-fit OSR Mud-flap after the above moment - Done 29th March '08
- Check gear linkage as it kept on jumping out of 2nd gear in the woods
- Add map switch
- Sort out issues over rear trim / seats........ New rear seats sourced, new base part is now fitted, back still be fitted - 29th March '08
- New labels for car ie tyre pressure etc...
- And anything else i find !
- Re-fit interior light

Updated : 19th March '08